Solution: Steam boiler

Solution: Steam boiler

TÜV AUSTRIA INDIA PVT. LTD. – Nagpur/Maharashtra (Corporate Office)

TÜV AUSTRIA | India

Office No. 302, Plot no. 95, Renuka Complex, Friends Colony, Katol Road 440013 Nagpur/Maharashtra India

+91712-4033988

Send email

TÜV AUSTRIA INDIA – Regional Office (South)

TÜV AUSTRIA | India

12-62/1/13, BC colony, Revenue ward 71, Flat no. 205, Tirumala residency, Near Polytechnic college, Pulalipalam Road, Pendurthi 531173 Visakhapatnam, Andhra Pradesh India

+91(0)283-6299131

Send email

TÜV AUSTRIA INDIA PVT. LTD. – Gujarat (Regional Office North/West)

TÜV AUSTRIA | India

Plot no. 284, 1st floor, Sector No. 1-A, Gandhidham (Kutch) 370201 Gujarat India

+91(0)283 6299131

Send email

TÜV AUSTRIA INDIA – Surat Branch Office

TÜV AUSTRIA | India

Dharmanandan avenue, Flat no. E-402, 4th Floor, B/h. Ruchi Township, Kawas patiya, Ichchhapor 394510 Surat/Gujarat India

+91(0)283-6299131

Send email

Regelwerke und Downloads

"Steam boiler conformity inspection, first inspection, periodical inspections."

A steam boiler is an assembly containing vessels or tubes subject to overheating and vessels or tubes not subject to overheating, or any combination thereof, including their equipment, and which is fired or otherwise heated and has the purpose of

(a) water vapor of greater than atmospheric pressure; or

(b) to produce water of a temperature exceeding 110°C (hot water boiler) for the purpose of use outside this arrangement. The steam boiler also includes superheaters, recoolers and their equipment located in the flue gas stream.

Assessments and test procedures

The steam boiler system must be subjected to a conformity assessment procedure by the manufacturer in accordance with Directive 2014/68/EU or the Dual Pressure Equipment Ordinance (DDGV).

Proper manufacture is confirmed by the CE mark on the fabrication plate and by the manufacturer’s declaration of conformity. This and the operating instructions represent the minimum documentation.

The operator must arrange for the initial operating test to be carried out and for the subsequent periodic tests to be carried out. The test intervals are regulated in the Pressure Equipment Monitoring Ordinance (DGÜW-V).

I am tami

Are you here for the first time? I will be happy to help you find your way around.

Check certificate

Find a solution

Submit science award

Check certificate

  • Person Certificate

  • Product Certificate

  • System Certificate

  • Verification of Conformity

Enter the data and check a certificate

Find a solution

WiPreis einreichen

WiPreis submit

"*" indicates required fields

1
2
3
4
First, please select in which category you would like to submit*

You cannot copy content of this page