Solution: Plant Safety: Bow-Tie

Solution: Plant Safety: Bow-Tie

TÜV AUSTRIA INDIA PVT. LTD. – Nagpur/Maharashtra (Corporate Office)

TÜV AUSTRIA | India

Office No. 302, Plot no. 95, Renuka Complex, Friends Colony, Katol Road 440013 Nagpur/Maharashtra India

+91712-4033988

Send email

TÜV AUSTRIA INDIA – Regional Office (South)

TÜV AUSTRIA | India

12-62/1/13, BC colony, Revenue ward 71, Flat no. 205, Tirumala residency, Near Polytechnic college, Pulalipalam Road, Pendurthi 531173 Visakhapatnam, Andhra Pradesh India

+91(0)283-6299131

Send email

TÜV AUSTRIA INDIA PVT. LTD. – Gujarat (Regional Office North/West)

TÜV AUSTRIA | India

Plot no. 284, 1st floor, Sector No. 1-A, Gandhidham (Kutch) 370201 Gujarat India

+91(0)283 6299131

Send email

TÜV AUSTRIA INDIA – Surat Branch Office

TÜV AUSTRIA | India

Dharmanandan avenue, Flat no. E-402, 4th Floor, B/h. Ruchi Township, Kawas patiya, Ichchhapor 394510 Surat/Gujarat India

+91(0)283-6299131

Send email

Bow-Tie

In which region do you need this solution?

"A qualitative risk assessment method resulting in a that combines cause and hazard (fault tree) with the consequence steps (event tree)."

Bow-Tie Analysis is a structured, qualitative method for risk assessment. The result is a diagram that combines both the chain of cause and hazard (fault tree) as well as the chain of consequence steps (event tree). The fault tree on the left and the event tree on the right are connected by the associated top event (such as a product release) in the middle.

Ein Bow-Tie-Diagramm soll, wenn möglich, für alle Major-Accident-Hazards (MAH) erstellt werden, welche gegebenenfalls in einer Gefahren- und Risikoanalyse zu identifizieren sind.

The Bow-Tie diagram provides a snapshot of the cause/hazard and consequences of the main scenarios as well as control elements at the time of analysis. It also provides a snapshot of the barriers used to prevent the occurrence of the adverse event or to limit its impact. Once the examination is complete, the situation may change, for example because control measures have taken effect.

Bow-Tie diagrams are created by depicting following building blocks:

  • Hazard (example: presence of hydrocarbons)
  • Top event due to hazard (example: product release)
  • Causes that enable the occurrence of a top event
  • Consequences due to the occurrence of a top event
  • Barriers which are intended to prevent the occurrence of the top event on the causal side (preventive control barriers)
  • Barriers intended to reduce the extent of damage once a top event has occurred (mitigative barriers)

A Bow-Tie diagram should be prepared, if possible, for all Major Accident Hazards (MAHs) which are to be identified in a hazard and risk analysis if necessary.

I am tami

Are you here for the first time? I will be happy to help you find your way around.

Check certificate

Find a solution

Submit science award

Check certificate

  • Person Certificate

  • Product Certificate

  • System Certificate

  • Verification of Conformity

Enter the data and check a certificate

Find a solution

WiPreis einreichen

WiPreis submit

"*" indicates required fields

1
2
3
4
First, please select in which category you would like to submit*

You cannot copy content of this page