Solution: Systemic Hazard and Risk Analysis

Solution: Systemic Hazard and Risk Analysis

TÜV AUSTRIA INDIA PVT. LTD. – Nagpur/Maharashtra (Corporate Office)

TÜV AUSTRIA | India

Office No. 302, Plot no. 95, Renuka Complex, Friends Colony, Katol Road 440013 Nagpur/Maharashtra India

+91712-4033988

Send email

TÜV AUSTRIA INDIA – Regional Office (South)

TÜV AUSTRIA | India

12-62/1/13, BC colony, Revenue ward 71, Flat no. 205, Tirumala residency, Near Polytechnic college, Pulalipalam Road, Pendurthi 531173 Visakhapatnam, Andhra Pradesh India

+91(0)283-6299131

Send email

TÜV AUSTRIA INDIA PVT. LTD. – Gujarat (Regional Office North/West)

TÜV AUSTRIA | India

Plot no. 284, 1st floor, Sector No. 1-A, Gandhidham (Kutch) 370201 Gujarat India

+91(0)283 6299131

Send email

TÜV AUSTRIA INDIA – Surat Branch Office

TÜV AUSTRIA | India

Dharmanandan avenue, Flat no. E-402, 4th Floor, B/h. Ruchi Township, Kawas patiya, Ichchhapor 394510 Surat/Gujarat India

+91(0)283-6299131

Send email

Sytemische Gefahrenanalyse & Risikoanalyse

In which region do you need this solution?

"TÜV AUSTRIA analysis covers all aspects of a plant: production, process, engineering, automation, chemistry, pipeline construction & maintenance."

Current understanding of safe operation of plant and machinery requires a systematic approach in order to reliably identify and eliminate risks or reduce them to an acceptable level. In addition to protecting people and the environment, this also encompasses economic risks such as production outages up to the destruction of individual components or even entire plants.

The aim of systematic risk analysis is to identify and evaluate possible divergences from intended and planned functions and activities.

The outcome of systematic hazard and risk analyses results in:

  • Identification of vulnerabilities
  • Specific instructions for necessary modification measures
  • Reliable results provided by a team of experts and traceable documentation
  • Planning reliability

When a team of experts participating in an analysis is assembled, both by the operators and by the planners of a new plant, care must be taken to cover all aspects of the plant, such as: production, process engineering, electrical engineering, automation technology, chemistry, apparatus and pipeline construction, and maintenance.

The analysis is led by an independent facilitator from TÜV AUSTRIA and the outcome of the discussions is recorded by a secretary for all to see.

I am tami

Are you here for the first time? I will be happy to help you find your way around.

Check certificate

Find a solution

Submit science award

Check certificate

  • Person Certificate

  • Product Certificate

  • System Certificate

  • Verification of Conformity

Enter the data and check a certificate

Find a solution

WiPreis einreichen

WiPreis submit

"*" indicates required fields

1
2
3
4
First, please select in which category you would like to submit*

You cannot copy content of this page